Ask a security team where their cryptography lives and you will usually hear about TLS certificates and the internal PKI. Both true. Both a fraction of it.
The rest sits in places nobody put on a list. Badge readers. Security cameras. Operational technology still running software written in the 1990s. SSH keys generated by someone who left years ago. Hard-coded keys in an application nobody has opened since the last migration. None of it was ever in the certificate program, so none of it shows up in certificate tooling.
That is the wall most organizations hit on day one of a post-quantum migration, well before anyone picks an algorithm. This checklist will not produce a complete cryptographic bill of materials on its own. It will tell you what belongs in one, what fields each entry needs to be useful, and how to sequence the work so the first ninety days produce something you can act on.
Months
Where recovery time sits today for a full trust chain replacement. It needs to be hours.
4 to 6
Months observed in banking to distribute a new chain to every application, including offline systems
3 lenses
Network, endpoint and code analysis. No single discovery method finds all of it.
2030
OMB M-26-15 target for federal civilian agencies to mitigate as much quantum risk as feasible
What is inside
01
Define scope
A working scope list across certificates and PKI, keys outside the certificate program, the places teams routinely forget, and third-party dependencies. The boxes you cannot check become your first work queue.
02
Decide what each entry must contain
Nine fields per asset, including the two most teams skip: whether the source and the destination can each actually accept post-quantum algorithms today. Without both, you find the gap during migration rather than during planning.
03
Sort what you find
Three buckets based on capability at both ends, plus a lifetime test that cuts the immediate scope down to something a team can actually start on.
04
Set a crypto agility target
Not whether you can replace a certificate, but how long before every application in your estate trusts a new chain and you are issuing again. Measured, not estimated.
05
Avoid the two common failure modes
The team that oversimplifies and the team that is overwhelmed. Both are inventory problems, and they need different first moves.
06
First ninety days
A dated sequence from naming an owner through to reporting the inventory as a standing metric rather than a completed project.
Who should use this
- Security architects and PKI leads scoping a cryptographic inventory for the first time
- CISOs and IT leaders who need to size a post-quantum program before committing to a timeline or a budget
- GRC and compliance teams tracking M-26-15, NIST IR 8547 and sector equivalents
- Federal and defense industrial base teams working to the 2030 and 2031 migration phases